Egress Windows (Before & After)
Excavation is first. Followed by french drains and gravel.
1
Lots of dirt has to be dug out. The trench is about 12’ deep.
2
Stone work and backfilling dirt comes next.
3
The red lines indicate the new window size.
Original windows (BEFORE)
Window gets taken out. Larger hole gets cut.
4
View from inside through the screen.
One more before/after!
It’s so good, right?!
We have two windows in the basement and I just love how they turned out.